Daycare Center, Ditzingen

Construction + Operation

Client representation Project analyses

The City of Ditzingen planned the development of several daycare centers at different locations across the city. The objective was to establish a sustainable overall project delivery strategy and to implement the “Ob dem Korntaler Weg” daycare center as a pilot project under a total contractor model.

albrings + müller ag was initially commissioned to carry out a comprehensive project analysis in order to verify the existing project framework, identify potential risks, and evaluate suitable procurement and delivery models. Based on these findings, albrings + müller ag assumed a two-stage client representation role – ranging from project specification and structured support of the EU-wide procurement process through to the appointment of a total contractor.

Challenges

The parallel planning of several new daycare center developments required a higher-level strategic approach with regard to synergies, scheduling logic, and resource allocation. At the same time, political resolutions, existing space programs, and differing site conditions had to be consolidated into a coherent and implementable overall project framework.

A key challenge was the structured coordination of all user requirements across the various municipal departments and their translation into a robust employer’s requirements specification. In addition, the legally compliant and economically efficient execution of an EU-wide procurement procedure under a total contractor model presented significant organizational and procedural complexity.

Added Value

The comprehensive project analysis provided a reliable basis for decision-making for both the municipal administration and the city council, while defining a suitable delivery model aligned with the municipality’s framework conditions. Through the structured project specification process, a clearly coordinated space and quality program as well as a comprehensive employer’s requirements specification were developed, serving as a blueprint for future daycare center developments within the city.

As part of the procurement advisory services, we ensured transparency, cost efficiency, and legal certainty throughout the entire EU-wide tender procedure. The contract was successfully awarded to a total contractor within the defined project schedule and approved budget.

Project data

  • Service area

    Construction + Operations

  • Solution

    Project Analysis and Client Representation

  • Client

    City of Ditzingen

  • Scope

    Feasibility study of delivery models and project structuring through to procurement and award to a total contractor

  • Concept

    Total contractor model, owner-led delivery within the municipal budget

  • Area

    approx. 2,015 sqm

  • Object count

    1

  • Construction year

    2025/2026

  • Location

    Ditzingen

  • Project value

    € 8.6 million

  • Project specifics

    Funding for climate-friendly new construction with QNG certification and EH40 energy efficiency standard

  • Timeframe

    05/2023 to 08/2025

  • Gross floor area

    approx. 1.500 sqm

  • Project scope

    Four-group daycare center